553. Stan – Its Progress and Future
$20.00
SAWE Members get a $200 store credit each year.*
*Store credit coupon available at checkout, click the button in your shopping cart to apply the coupon.
Not applicable to SAWE textbooks and current conference technical papers.
Paper
Abstract
At the 1965 SAWE Conference I described the STAN system in paper No. 506. At that time we were in the throes of testing the system aboard one of Pan Am’s jet freighters and a lot of my paper was based on theory and ‘things to come.’
Now I am happy to report the progress which we have made over the year with STAN and the excellent results obtained with the system – which is now in operation aboard Pan Am’s complete 707-320C jet freighter fleet and will soon be installed aboard their 727QC’s as well.
The results of nearly a year of operational history are summarized in this paper together with a progress report on our other activities with the STAN system – primarily out C-5 activities, C-141 activities and related military projects plus the ever increasing activity in commercial airline operations.